Friday, August 13, 2010

Day One: Preparing the Land

Day Zero consisted of Jack Traub arriving with a load of plywood which he dumped on our parking lot to prepare for the heavy machinery. It was a big deal to us because it was the first visible sign that we are about to have our parking lot paved, at long last.

Yesterday his dad Tim, the boss, came by to talk about plans. And today, the big machines arrived! I don't even know what they are called, actually. But they are big and they make a lot of noise and they beep whenever they back up.

The actual work on the actual parking lot has not yet begun. But the place is a mess anyway. They moved the little shed to the edge of the ravine, sending salamanders and frogs fleeing for their little amphibian lives. And they scraped up a foot or so of topsoil all around the firepit and playground equipment. The plan is to level that area with fill they scrape up from the parking lot, then they'll put the topsoil back over it.

So our world is changing. There is now a huge mound of dirt in front of Cabin 2. The Stable Chapel is now housing our snow removal equipment. The old tree stump on the way to Arts and Crafts is gone. But they rescued the flowers that were planted in it! I walked around and looked at the newly exposed earth, the white lines painted on the grass, the big machines parked randomly around the property. It's like seeing Trinita in its underwear. Awkward and undignified.

It will never be the same. But then
, it never is. Except where it counts.

No comments: